Features

Air Handling Unit Installation

Air Handling Unit Installation



Chiller and Piping Installation

Stadium Upgrades for the 2011 All‑Star Game



Feed Water Heater Replacement

Feed Water Heater Replacement

Special Projects

Special Project Division works closely with clients, designers and general contractors to produce a mechanical system that performs to meet or exceed all expectations. Our goal is a trouble free performance of a mechanical system, whether it is located in a small commercial building, large industrial complex or a power generating station. Our goal is for our customer to use our knowledge, experience, dedication, planning and craftsmanship to provide a working end product.

Our personnel are our strongest asset. This starts from the outside mechanical consultant or general contractor working with our staff, our experienced staff working with our craftsmen in the field and to our craftsmen that provide a safe and quality installation of the mechanical/plumbing systems. All having a common goal replica watches, which is to build and install the best mechanical/plumbing system for the dollars invested. Our staff and field supervision are continually planning, scheduling and looking forward to resolve issues before they become problems on our projects. Our goal is to have resolution to the issue before we bring it to the client or engineer. This is just one of many time saving attributes our personnel offer our customers.

Special Projects Division works with Designers/Engineers of mechanical/plumbing systems regardless of size, complexity, location and working conditions. We can properly plan, schedule and coordinate construction to meet the client’s requirements, specifications and time tables. Challenging assignments present no obstacles to our ability to perform. Our employees have the technical knowledge and the internal/external work systems necessary for all types of projects from mechanical/plumbing installations to rush construction programs. Our procedures can minimize costly delays in the initial production of a new facility or retro fit facility. The combination of estimate break outs, accurate ordering/purchasing, constant job control and sense of professional integrity results in each of our clients receiving the best possible return on their mechanical investment.

Installation is our specialization. Our division welcomes the “problem job.” Projects that would normally deter some contractors because of inherent difficulties pose challenges that are fully within our capacity to produce. We perform all kinds of mechanical/plumbing work; our specialization is in the field of power piping replica watches, process piping, industrial plumbing, commercial HVAC/Plumbing, refrigeration systems and ASME Code Welding. So no matter if it is a remodel of a high school bathroom to a complete process piping retrofit outage, our staff and craftsmen are ready to complete what is needed safely, with great quality and on time. Our Foley Service Department will also work with our construction team on start-up and with the client on future service needs on new and existing equipment.

Performance of the Special Project Division is geared to handle any type of mechanical/plumbing installation, including general construction at any location using skilled craftsman. The same efficient and professional service is provided to our clients whether they are 10 miles or 1000 miles away from our home office. This is our key success factor in this industry.